Inquiry into Victorian Auditor-General Office Report “Towards a ‘Smart Grid’ – the Roll-out of the Advanced Metering Infrastructure”

The Public Accounts and Estimates Committee is currently conducting a review of the findings of the Auditor-General reports tabled during 2009 and 2010.

The Committee has invited written submissions from individuals and organisations with an interest or expertise in the subject matter, to address any aspects of the findings and recommendations contained within the 2009 report Towards a ‘Smart Grid’ – the Roll-out of the Advanced Metering Infrastructure.

The closing date for submissions is Friday 15 November 2013.

More information can be found at: http://www.parliament.vic.gov.au/paec/inquiries/article/2143

This entry was posted in Smart Meter and tagged , , , . Bookmark the permalink.

7 Responses to Inquiry into Victorian Auditor-General Office Report “Towards a ‘Smart Grid’ – the Roll-out of the Advanced Metering Infrastructure”

  1. David says:

    I’d be inclined to put forth this Smart Meter study paper, done by Don Maisch PhD, as it’s simple, clear and concise –
    http://www.emfacts.com/download/SM_case_studies.pdf

  2. malcolm says:

    Everyone should send a submission to this committee. Only many complaints will achieve their removal.

  3. Linda Nemeth says:

    Can we arrange a collective response to the 2009 report Towards a ‘Smart Grid’ – the Roll-out of the Advanced Metering Infrastructure, that some of our experts could provide collective input?

Leave a comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s